Place

Jinja - Uganda


Client

Salini Costruttori S.p.A.


Year

2009 - 2012

Description for Bujagali (Uganda)

Hydroelectric project on the Victoria Nile River within an installed power of 250 MW.

Main Features

  • Rockfill dam with clay core (H = 30 m, L_crest = 560 m)
  • Spillway (Q = 4'500 m³/s, L = 19 m)
  • Intake (No. 2 wheel gates, H x L = 9 x 10 m)
  • Open-air power house inside dam body (No. 5 Kaplan turbines, IP = 250 MW, E = 1'438 GWh/y)
  • Substation (132 kV)

Engineering Services

  • Construction design (in collaboration)
  • Construction drawings
  • Technical assistance on site (in collaboration)