Place

Mersin - Turkey


Client

TGT Electric Power Construction, Ministry of Energy & Natural Resources


Year

1993 - 2000

Description for Limonlu (Turkey)

Limonlu HPP comprises 4 power plants in cascade to be constructed in 2 phases on the Lamas River: Phase 1 = 50 MW and Phase 2 = 26 MW.

Main Features

The Phase 1 works comprise Lamas III and Lamas IV plants:

  • Weir (H = 8 m, L = 40 m)
  • Power Tunnels (L = 5 km, D = 3 m)
  • Surge Tank (H = 16 m, D = 12 m)
  • Penstocks (No. 2, L_tot = 3 km; D = 2-1 m)
  • Power Houses (No. 2 Francis turbines; 2 x 15 MW; 2 x 10 MW)
  • Roads (L = 8 km)
  • HV Transmission Line (V = 154 kV; L = 1.2 km)

Engineering Services

  • Feasibility Study
  • Site Investigations
  • Final Design
  • Tender Documents