Limonlu (Turkey)

Hydroelectric Power Plant

Place:

Mersin - Turkey

Customer:

TGT Electric Power Construction, Ministry of Energy & Natural Resources.

Year:

1993 – 2000

Project Description:

Limonlu hpp comprises 4 power plants in cascade to be constructed in 2 phases on the Lamas River: Phase 1 = 50 MW and Phase 2 = 26 MW.

Main Features:

The Phase 1 works comprise Lamas III and Lamas IV plants:

  • Weir (H = 8 m, L = 40 m)

  • Power Tunnels (L = 5 km, D = 3 m)

  • Surge Tank (H = 16 m, D = 12 m)

  • Penstocks (No. 2, L_tot = 3 km; D = 2-1 m)

  • Power Houses (No. 2 Francis turbines; 2 x 15 MW; 2 x 10 MW)

  • Roads (L = 8 km)

  • HV Transmission Line (V = 154 kV; L = 1.2 km)

Engineering Service:
  • Feasibility Study
  • Site Investigations
  • Final Design
  • Tender Documents