• Water Supply - domestic water supply pipeline for the city of Lusaka, Zambia - Studio Pietrangeli Dams Consultants in Africa and Europe
  • Water Supply design - domestic water supply pipeline  - Water treatment plant for the city of Lusaka, Zambia - Studio Pietrangeli Dams Consultants in Africa and Europe

Lusaka (Zambia)

Water supply

Place:

Lusaka - Zambia

Customer:

Lusaka Urban District Council – Republic of Zambia

Year:

1989 – 1992

Project Description:

Lusaka project including domestic water supply pipeline for the city of Lusaka, Emergency health works in the area of Matero, in the industrial area and in the township

Main Features:
  • Rehabilitation of wells along Mumbwa Road (Submerged pumps No. 8, D ≤ 350 mm, H ≤ 100 m, Q ≤ 400 m³/h)
  • Drilling of No.4 new wells along Mumbwa Road
  • Rehabilitation of pumping plant along Lumumba Road (pumping stations No. 2, emergency diesel generators No. 2)
  • Pipeline A - Mumbwa Road from the 5 wells along the Lumumba Road (Type GRP, D = 600 mm, L = 0.5 km)
  • Pipeline B - Lumumba Road (Type GRP, D = 1'200 mm, L = 5.1 km)
  • Matero reservoir (No.2 chambers; V = 30'000 m³)
  • Rehabilitation of existing reservoir (Volume = 11'000 m³)
  • Command and control plant
  • Water treatment plant
  • Pipeline for connection to the Mumbwa Well Field (Q = 190 - 507 l/s, D = 200 - 250 mm, L = 30 km)
Engineering Service:
  • Investigations
  • Topographical surveys
  • Final design