Place
Mersin - Turkey
Client
TGT Electric Power Construction, Ministry of Energy & Natural Resources
Year
1993 - 2000
Description for Limonlu (Turkey)
Limonlu HPP comprises 4 power plants in cascade to be constructed in 2 phases on the Lamas River: Phase 1 = 50 MW and Phase 2 = 26 MW.
Main Features
The Phase 1 works comprise Lamas III and Lamas IV plants:
- Weir (H = 8 m, L = 40 m)
- Power Tunnels (L = 5 km, D = 3 m)
- Surge Tank (H = 16 m, D = 12 m)
- Penstocks (No. 2, L_tot = 3 km; D = 2-1 m)
- Power Houses (No. 2 Francis turbines; 2 x 15 MW; 2 x 10 MW)
- Roads (L = 8 km)
- HV Transmission Line (V = 154 kV; L = 1.2 km)
Engineering Services
- Feasibility Study
- Site Investigations
- Final Design
- Tender Documents