Place

Sierra Leone


Client

National Authorising Office (NAO) – National Power Authority (NPA)


Year

2011

Description for NAO Transmission Line (Sierra Leone)

Restore of the MV and LV distribution system in the two towns of Makeni and Port Loco, distribution lines and substations and development of the 34.5 kV Shield Wire Scheme.

Main Features

  • Restore of the MV and LV distribution system in the two towns of Makeni and Port Loco:
    • 30,000 beneficiaries
    • 30 MW Peak load
  • Distribution lines and substations: 34.5 kV - 11.5kV - 0.415/0.240 kV.
  • Development of the 34.5 kV Shield Wire Scheme from the existing 161 kV OHTL (Overhead Transmission Line)
 

Engineering Services

  • Feasibility studies
  • Supervision of construction works (suspended)
  • Preliminary Design
  • Tender Documents
  • Assistance during procurement