Place
Abuja - Nigeria
Client
Sarin Iniziative Industriali S.p.A.
Year
1995 - 2002
Description for Bwari Aqueduct (Nigeria)
Water supply system for the district of Abuja, including pipelines, pumping station, storage and surge tank.
Main Features
- Pumping Station ( No. 6 pumps, Q = 310 l/s, H = 95 m )
- Main Pipeline ( D = 600 mm, L = 13.8 km, No. 50 wash out and air relief valves, No. 5 control cabins )
- Distribution Pipelines ( D = 150-300 mm, L = 8.3 km, No. 50 user points )
- Storage Tank ( V = 12'500 m³, H = 7 m )
- No. 1 Telecontrol System
- No. 50 Distribution Fountains
Engineering Services
- Feasibility study
- Topographical survey
- Final and construction design
- Supervision of construction for the contractor