Description for Bwari Aqueduct (Nigeria)

Water supply system for the district of Abuja, including pipelines, pumping station, storage and surge tank.

Main Features

  • Pumping Station ( No. 6 pumps, Q = 310 l/s, H = 95 m )
  • Main Pipeline ( D = 600 mm, L = 13.8 km, No. 50 wash out and air relief valves, No. 5 control cabins )
  • Distribution Pipelines ( D = 150-300 mm, L = 8.3 km, No. 50 user points )
  • Storage Tank ( V = 12'500 m³, H = 7 m )
  • No. 1 Telecontrol System
  • No. 50 Distribution Fountains
 

Engineering Services

  • Feasibility study
  • Topographical survey
  • Final and construction design
  • Supervision of construction for the contractor