Place
Abuja - Nigeria
Client
Salini Costruttori S.p.A.
Year
2003
Description for Millennium Park Multi-Purpose Project (Nigeria)
Design of hydraulic works, water supply and irrigation system, reservoir and tanks for Millenium Park in Abuja.
Main Features
- Temporary weir ( No. 1 )
- Reservoir No. 1 ( V = 1'700 m³ )
- Reservoir No. 2 ( V = 330 m³ )
- Reservoir No. 3 ( V = 500 m³ )
- Primary Pipeline ( Dmax = 300 mm , L = 4'000 m )
- Secondary Pipeline ( Dmax = 300 mm, L = 4'000 m )
- Pumps Type Flygt
- Ornamental fountains ( No. 80 )
- Telecontrol system
- Generator
Engineering Services
- Topographic site survey
- Construction design of hydraulic structures
- Hydraulic and structural calculations for irrigation and water supply system
- Structural calculations for civil works