Place

Kabwe - Zambia


Client

Muchinga Power Company Ltd


Year

2010 - 2012

Description for Muchinga Hydropower (Zambia)

Hydroelectric plant (IP = 255 MW) on the Lunsemfwa river downstream of the Mita Hill dam and of the Lunsemfwa hydroelectric plant

Main Features

  • Headrace channel ( L = 9 km, Qmax = 40 m³/s )
  • Headrace tunnel ( No. 2, Total L = 17 km, D = 5 m )
  • Mkushi dam (Arc type, H = 120 m, Lcrest= 350 m )
  • Surge shaft ( H = 60 m, D = 12 m )
  • Penstocks ( No. 3, D = 2.2 m, L = 1’000 m )
  • Surface Power House ( No. 3 Pelton turbines, IP = 3 x 85 MW )
 

Engineering Services

  • Conceptual Design
  • Feasibility Studies

Request Information
Dam Engineering Hydropower engineering