The planned hpp develops the hydropower potential of the river just upstream the reservoir of the existing Kurichhu hydropower plant Dorjilung hydropower is located in the Himalayas on the Kurichhu river, about 450 km east of Thimpu. PLACE
CLIENT YEAR Dorjilung, Buthan
Hydropower Projects
Dorjilung, Buthan
DORJILUNG
Hydropower Project
The planned HPP (IP = 1125 MW) develops the hydropower potential of the river (DH = 306 m, Q = 287 m3/s) located just upstream the reservoir of the existing Kurichhu hydropower plant (IP = 60 MW).
Dorjilung, Buthan
Druk Green Power Corporation Limited
2022 – 2024
Main Features
– Headrace tunnel (L = 15 km, D = 11 m)
– Surge Shafts (D = 26 m, H =135 m)
– Pressure shafts (No. 3, D = 5.5 m, H =330 m) Additional Informations
Dorjilung, Buthan
Dorjilung Hydropower Project
Engineering
ServicesReview of the existing preliminary design and studies
Basic studies
Detailed project design, in compliance with World Bank standards and Bhutanese guidelines, (activities carried out by SP in collaboration with Druk Green Power Corporation)