Description for Vranduk Hydropower (Bosnia and Herzegovina)
Vranduk project consists in a run off river power plant with an installed power of 19.6 MW.
Main Features
- Concrete Weir ( H = 9/19 m, Crest L = 119 m, Radial Gates N° 4 )
- Intake ( Width = 21.6 m, H = 16 m , N° 3 Gates – N° 2 Auxiliary Gates + N° 1 Main Gate )
- Power Tunnel ( D = 6.6 m, L= 1,462 m )
- Small Generating Unit ( Q = 18 m³/s, Net Head = 8.4 m, N° 1 Kaplan S Turbine, IP = 1.1 MW )
- Main Generating Unit ( Q = 100 m³/s, Net Head = 21.3 m, N° 2 Kaplan S Turbine, IP = 2x9,28 MW )
- 110/35/10.5kV GIS Switchyard
- Distribution lines (35 kV)
Engineering Services
- Pre-Contract Services (review of preliminary design, project planning and implementation, procurement process)
- Post-Contract Services (review of design documents, project and site management, monitoring and supervision of health, safety and environmental issues).