Publications
2018
Voltage Collapse Assessment in Developing Countries EHV Cross-Boundary Interconnection: A Case Study
Galantino S., Colucci I., Vignoli R., Nyirenda A.S.
2018
Voltage collapse assessment of the Lufubu – Kasama 330kV planned overhead line and power transfer capacity on the Zambia – Tanzania cross-border corridor
Galantino S., Colucci I., Nyirenda A.S.
2018
Planning Studies for the Gabon-Congo Interconnector: Static and Dynamic Transfer Limits
Galantino S., Ngari A., Iwandza J.M., Gatta F.M., Geri A., Lauria S., Maccioni M.
2018
HV Line Supports Alternatives Comparison in Remote African Areas: A Specific Example In Zambia for the Lufubu Cascade Link to the National Grid
Galantino S., Skobue H., Mikkelsen M.H., Colucci I., Vignoli R.
2017
Dam Foundation Grouting at Gibe III Dam – a case study
Pittalis G., Cagiano A., Pietrangeli A., Tesfamariam B.
2016
Development of the Lufubu River Basin Hydropower Cascade Project
Brasca A., Galantino S., Vulpiani F., Nyirenda A. S.
2016
Experimental results on the physical model of an USBR type II stilling basin
Brasca A., Pontillo M., Fecarotta O., Carravetta A., Del Giudice G., Padulano R.
2016
Fluorescent Tracer Tests for detection of dam leakages: the case of the Bumbuna Dam – Sierra Leone
Battaglia D., Bezzi A., Birindelli F., Rinaldi M., Vettraino E.