Skip links

Publications

2018

Voltage Collapse Assessment in Developing Countries EHV Cross-Boundary Interconnection: A Case Study

Galantino S., Colucci I., Vignoli R., Nyirenda A.S.

PDF
2018

Voltage collapse assessment of the Lufubu – Kasama 330kV planned overhead line and power transfer capacity on the Zambia – Tanzania cross-border corridor

Galantino S., Colucci I., Nyirenda A.S.

PDF
2018

Planning Studies for the Gabon-Congo Interconnector: Static and Dynamic Transfer Limits

Galantino S., Ngari A., Iwandza J.M., Gatta F.M., Geri A., Lauria S., Maccioni M.

2018

HV Line Supports Alternatives Comparison in Remote African Areas: A Specific Example In Zambia for the Lufubu Cascade Link to the National Grid

Galantino S., Skobue H., Mikkelsen M.H., Colucci I., Vignoli R.

PDF
2017

Design of Gibe III Dam Middle Level Outlets

Cagiano A., Pietrangeli A., Pianigiani F.

PDF
2017

Dam Foundation Grouting at Gibe III Dam – a case study

Pittalis G., Cagiano A., Pietrangeli A., Tesfamariam B.

PDF
2017

Design of Grand Ethiopian Renaissance RCC Main Dam ( H=175 m )

Pietrangeli G., Bezzi A., Rossini C., Masciotta A., D’Alberti D.

PDF
2017

Gibe III Dam Monitoring System

Pietrangeli G., Cagiano A., Pittalis G., Rossini C.

PDF
2017

Innovative Application of Giraffe Technique for Dam Foundation Mapping

Rinaldi M., D’Alberti D., Cutini S.

PDF
2016

Development of the Lufubu River Basin Hydropower Cascade Project

Brasca A., Galantino S., Vulpiani F., Nyirenda A. S.

PDF
2016

Experimental results on the physical model of an USBR type II stilling basin

Brasca A., Pontillo M., Fecarotta O., Carravetta A., Del Giudice G., Padulano R.

2016

Fluorescent Tracer Tests for detection of dam leakages: the case of the Bumbuna Dam – Sierra Leone

Battaglia D., Bezzi A., Birindelli F., Rinaldi M., Vettraino E.

PDF